Williamston Bathroom Update
Project Overview
Bathroom pull and replace remodel in Williamston, Michigan. The existing bathtub was removed and replaced with a walk-in shower, and hard-to-reach cabinets above the tub were pulled out to open up the shower space. The bathroom was updated with new painted cabinets, a quartz countertop, and updated fixtures. The tile floor was replaced with luxury vinyl tile.
Project Foreman
Christopher Hicks
Project Designer
Jaime Dunn
Project Goals
- Remove the existing bathtub and replace with a walk-in shower.
- Remove hard to reach cabinets above tub to improve shower space.
- Update the bathroom with new painted cabinets, quartz countertop, and updated fixtures.
- Remove tile floor and replace with luxury vinyl tile flooring.
Project Cost Category
Bathroom Midrange Economy
Project Development Start
JUNE 8, 2023
Production
Start
OCTOBER 16, 2023
Project
Completion
JANUARY 19, 2024