Williamston Bathroom Update

Project Overview

Bathroom pull and replace remodel in Williamston, Michigan. The existing bathtub was removed and replaced with a walk-in shower, and hard-to-reach cabinets above the tub were pulled out to open up the shower space. The bathroom was updated with new painted cabinets, a quartz countertop, and updated fixtures. The tile floor was replaced with luxury vinyl tile.

Project Foreman

Christopher Hicks

Project Designer

Jaime Dunn

Project Goals

  • Remove the existing bathtub and replace with a walk-in shower.
  • Remove hard to reach cabinets above tub to improve shower space.
  • Update the bathroom with new painted cabinets, quartz countertop, and updated fixtures.
  • Remove tile floor and replace with luxury vinyl tile flooring.

Project Cost Category

Bathroom Midrange Economy

Project Development Start

JUNE 8, 2023

Production
Start

OCTOBER 16, 2023

Project
Completion

JANUARY 19, 2024