Okemos Bathroom Update

Project Overview

Update to the existing bathroom to bring up to date and improve the aesthetic and use of the bathroom space. Remodel of an existing main floor bathroom with update to shower size to enlarge shower. Remodel included demolition of existing bathroom with new cultured stone shower, new semi-custom vanity with upgraded medicine cabinet, floating shelves above toilet, new toilet, updated flooring, new shower door, new bathroom ceiling fan, and updated bathroom paint and accessories. Lighting and electrical updated along with updated plumbing including new vanity fixtures.

 

Project Foreman

Christopher Hicks

Project Designer

Jaime Dunn

Project Goals

  • Expand shower eliminating wall.
  • Follow a black and white design with clean lines and a modern aesthetic.
  • Keep existing window

Project Cost Category

Bathroom Midrange Designer

Production
Start:

JUNE 14, 2023

Project
Completion:

AUGUST 9, 2023