Skip to content

Laingsburg Bathroom Remodel

Project Overview

The existing bathroom with the small corner shower and large jacuzzi tub was feeling outdated with a poor use of space. The customer no longer used the jacuzzi tub (as is common) and wanted to use the space to expand the size of the shower. The customer also wanted more storage space so the large pantry cabinet was used to create a nook space that was great for the custom shower space. Demolition of existing master bathroom with remodel to include enlarged shower, removal of jacuzzi tub and update to layout.

Project Foreman

Dan Nanasy

Project Designer

Jaime Dunn

Project Goals

  • Remove the existing tub and replace update the space with a larger shower.
  • Update the existing vanity and countertop.
  • Replace all fixtures.
  • Update the flooring and bathroom painting and drywall.

Project Cost Category

Bathroom Midrange Designer

Project
Completion:

AUGUST 23, 2022

Let’s Plan Your Project the Right Way

Clear process. Fixed pricing. No surprises.

Every successful remodel starts with a clear plan. Schedule a consultation with Odd Fellows Contracting and let’s walk through your ideas, your timeline, and what it will realistically take to get there.

double_arrow