Skip to content

Haslett Composite Deck

Project Overview

The customer wanted to make their two-tiered deck into a larger single deck to allow for more space on the same level. Demolition of the existing pressure treated deck including removal of the substructure to allow for expansion of a new composite Trex deck. Decking was done with Trex decking and fascia. Railing was Feeney cable rail.

Project Foreman

Phill Nanasy

Project Designer

Jerry Dowell

Project Goals

  • Existing deck was rotting and needed a replacement.
  • Preserve the view to the back area with minimalist cable railing.
  • Keep a similar layout including the full wrap-around design.

Project Cost Category

Deck Composite Designer

Production
Start:

JUNE 1, 2022

Project
Completion:

JULY 27, 2022