East Lansing Front Porch Update

Project Overview

The existing deck was rotting and needed to be updated. The customer wanted a low maintenance decking material along with an update to the appearance and posts. Update of existing front porch replacing decking with Trex deking and Trex Railing. Replace existing old posts with new composite posts.

Project Foreman

Ian Blandthorn

Project Designer

Brian Taylor

Project Goals

  • Replace the rotted decking, railing, and posts with updated composite and vinyl for a lower maintenance restoration.
  • Utilize composite decking in a color selection that compliments the home vinyl color.

Project Cost Category

Deck Composite Economy

Production
Start:

JUNE 28, 2021

Project
Completion:

JULY 20, 2021