Skip to content

East Lansing Finished Basement Project

Project Overview

An open layout in their finished basement with a transitional design. They were interested in keeping their original fireplace intact. In their kitchen they wanted glass door cabinets and some open shelving for display. Framing of the basement and rooms. Insulation of the walls. Flooring using LVP/LVT flooring throughout. Drop suspended tile ceiling. Adding an egress window in bedroom space. Creating a full basement bathroom. Installing drywall. Roughing and finished electrical. Roughing and finished plumbing including all fixtures. Vanity cabinet install with cultured marble countertop. Painting basement including trim and casing.

Project Designer

Jerry Dowell

Project Goals

  • Update the existing finished (out of date) basement with a new area to entertain.
  • Incorporate a new basement kitchenette complete with wine storage and beer on tap.
  • Provide space for a pool table and area for movie and TV watching.

Project Cost Category

Basement Remodel Entertainment Zone

Project
Completion:

OCTOBER 8, 2018

Let’s Plan Your Project the Right Way

Clear process. Fixed pricing. No surprises.

Every successful remodel starts with a clear plan. Schedule a consultation with Odd Fellows Contracting and let’s walk through your ideas, your timeline, and what it will realistically take to get there.

double_arrow