East Lansing Double Deck Update
Project Overview
An update of their existing deck to composite with a cleaner look and fix to the failing old deck. Demolition of existing deck including substructure and update with new Trex decking and Transcend railing. Included updating to current code.
Project Foreman
Ian Blandthorn
Project Designer
Mark Dixon
Project Goals
- Keep the same layout and update.
- Replace the rotted wood deck with a new structure and top with composite trex decking and railing.
Project Cost Category
Deck Composite Designer
Project
Completion:
MARCH 2, 2022