Service Overview
Customer's Wishes
This Lansing kitchen remodel included a full demolition of the existing kitchen cabinets, flooring, drywall, etc. to prepare for the kitchen update. The main goal was to brighten the kitchen and make some improvements to the overall kitchen functionality. One specific change was to remove the microwave from above the range and install an exterior venting vent hood. The microwave was moved to the island and all other appliances stayed in their previous location. The flooring was updated to get away from the presence of so much dark oak throughout the home as a means to further brighten the kitchen.
Location: Lansing, Michigan
Project Completed: 2024
Designer: Jaime Dunn
Foreman: Phill Nanasy