Service Overview
The project included updating the existing kitchen along with turning the main floor half-bath into a full bathroom by updating the existing bathroom and expanding it to add a new walk-in shower. Along with the kitchen remodel, we raised a portion of the floor from the garage entry to make that area by the garage entry and bathroom less difficult to step through. In addition, the dining area was updated with a coffee and storage cabinet area.
Customer's Wishes
New...they were tired of the existing kitchen and lack of storage. The lighting was not good and there was a lot of wasted space. While converting the half-bath to a full bath, the fridge had to move so it was a great time to just update everything.
Location: Lansing, Michigan
Project Completed: 2023
Designer: Mark Dixon
Foreman: Phill Nanasy