Service Overview

Customer's Wishes

This Williamston bathroom remodel started with a hole in the floor. The existing shower had leaked over time and rotted out the subfloor leaving a soft spot that was a danger to the homeowner. Even after the bathroom remodel was complete and the flooring was replaced and repaired, the homeowner was still in the habit of avoiding that spot! Odd Fellows Contracting updated the entirety of the bathroom with a new walk-in bathtub that includes a shower surround giving the option for either a bathtub or shower. The vanity cabinet was replaced with a new Pioneer Cabinetry cabinet including a new above the toilet storage cabinet. We brightened the space by adding an illuminated medicine cabinet mirror and new ceiling and vanity cabinet lighting. After the replacement of the subfloor, we installed new LVT flooring and baseboards. The plumbing was updated at the bathroom along with other changes to the home including new kitchen countertops and kitchen recessed LED lighting.

Location: Williamston, Michigan

Project Completed: 2025

Designer: Jerry Dowell

Foreman: Nick (Cutty) Childers

Project Gallery